A work of 4900j is done on road of mass 50kg to lift it to a certain height .. calculate the height through which the load is lifted
Share
A work of 4900j is done on road of mass 50kg to lift it to a certain height .. calculate the height through which the load is lifted
Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.
Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.
Verified answer
Work done = change in potential energy4900=50×9.8×h
h=10 m