dhruthisavitri9 Asked: September 2023 15 men complete a work in 24 days.How many men are needed to completethat work in 18 days?A) 10 B) 15 (20C) 20
dhruthisavitri9 Asked: December 2022 scenarioin mumbai temperature is 15 c at 800am temperature increased by 2 c every hour till1200 noon after 1200 noon temperaturedecreased